Sports clubs sorting players into squads for training drills need bibs that go on fast and stay put through sprints and scrimmages — the elasticated sides and stretchy pull-over fit handle that without any faffing about. PMS-matched colours plus free names and numbers mean coaches can tell squads apart at a glance instead of shouting across the field. Just factor in the 35 working day lead time so your bibs are ready before pre-season, not during it.
Functional pull-over bib manufactured from 150gsm 100% Ultra Mesh Polyester which is moisture-wicking and breathable. Fitted with elastics for a stretchy fit and bias-finished armholes and collar. The custom artwork is PMS matched with personalisation free of charge. A production lead time of 35 working days applies to this product.
| Dimensions | [] |
| Colours | Body: White. |
| Packaging | Loose packed. |
| Carton dimensions | 55.00 × 30.00 × 58.00 cm |
| Carton quantity | 100 |
| Branding | Full-Colour |
| Personalisation | Yes |
| Production Lead Time | 35 working days |
| Custom Labels | Yes (Free of Charge) |
| Country of Origin | China |
| Materials | |
| Bib | Polyester (PES) |